Date testing report of PV plant in Shandong

Sep. 30, 2019

With / Without using optimizer

Date testing report of PV plant in Shandong


2. Power generation increasing

After installing optimizers, the total power generation of this PV plant increasedl2.79% in three days (from 2017-7-19 to 2017-7-21).

Date

Power generation (kWh)

Increasing   ratio

Before

After

2017-7-19

15.085

17.944

18.95%

2017-7-20

22.378

25.979

16.09%

2017-7-21

19.616

20.454

4.28%

Total

50.078

64.377

12.79%

 

3. Mathematical model and analysis

The IV curve of PV module means each voltage value has its unique corresponding current value. And the smaller voltage value corresponds bigger current value. Each IV curve has one peak without shading, that's the Max Power Point (MPP). But more peaks would be found on the curve when there were shadings on the module, and the module connections in serial and in parallel would increase the peaks on the curve. But none of the peaks on the curve is the real MPP of the PV systems.

After the installation of optimizers, each module should work at its own MPP, and optimizers would send daily operation data to the server in Internet. Then we can analysis the data and calculate the system daily power generation, find out the power increasing ratio between arrays with and without optimizers.


Module PV curves with / without optimizer

Voltage and power PV system
characteristic curve

Date testing report of PV plant in Shandong

System Voltage(V)



Blue line - PV module without optimizer

Purple line- Installed the optimizer

Compare the voltage and the power